No sanding, no staining, no splinters under bare feet. Composite decking that keeps its color through New England winters, installed on a frame built to outlast it, for homes across MetroWest and Middlesex County.
Think about the last few springs. A weekend lost to power-washing, a gallon of stain that never looks the way it did on the can, and a board by the grill that’s starting to go soft.
Now picture the other version. You step out with your coffee and the boards look the same as the day they went down. A spilled glass of wine wipes off with a rag. The kids run across barefoot all afternoon. Your Saturday belongs to outdoor time with the family, not the to-do list.
Splinter-free boards and a surface that shrugs off claws, sunscreen and popsicles. A quick rinse with the hose is the whole cleaning routine.
If you’ve stained a wood deck more than twice, you already know the math. Composite decks skip the sanding, sealing and staining for good, so the time goes back to you.
The boards are pricier upfront than pressure-treated pine, but they carry long manufacturer warranties and need almost nothing year after year. The longer you live in the home, the better the trade looks.
| Capped board | Full PVC | Mineral-based | |
|---|---|---|---|
| What it is | Wood-plastic core with a protective shell | All-plastic board | Mineral and polymer core |
| Weight | Heaviest | Lightest | Light |
| Heat in full sun | Warm in dark colors | Stays cooler | Stays cooler |
| Best for | Most backyards | Pools and wet spots | Shaded, damp yards |
01
A protective shell wraps a wood-and-plastic core, so stains and fading stay on the surface and the core stays rot-free. This is the board most homeowners choose, and brands like Trex and TimberTech offer dozens of colors.
02
Lighter and fully waterproof, so they’re the top pick around a pool or hot tub where the surface stays wet.
03
Newer boards with a mineral core that resists mold and moisture, which matters in shady, tree-lined backyards.
04
Light gray, weathered wood tones or rich browns, most with a realistic grain pattern. Boards with color variation hide pollen, leaves and the scuffs of outdoor furniture between sweeps.
These boards expand in summer heat and shrink in January cold. Gaps at board ends and edges follow the manufacturer’s spacing, so nothing buckles in August or opens wide in February.
The boards may be maintenance-free, but the framing under them is still wood. Joists get a protective tape on top, and they’re spaced closer than for wood decking, so the surface stays flat and firm.
Many Framingham yards sit under tall oaks and pines. Capped and mineral-based boards resist the mold that grows on damp, shaded wood, and leaves rinse off instead of staining.
A plastic shovel and calcium chloride ice melt are safe on most capped boards, so the path to the grill stays open all winter in Framingham.
Clips that grip the board edges replace face screws, so the surface stays smooth and screw-free from end to end.
A contrasting board runs around the edge like a frame, hiding the cut ends and giving the deck a finished, custom look.
Matching rails, aluminum balusters (the vertical rail pieces), or cable rail for an open view of the yard. Stairs can step down to a patio or a lawn.
Stair lights, post-cap lights, a bench along the edge, or a privacy screen for outdoor dinners away from the neighbors’ view.
We visit, measure the yard and the back of the home, and walk you through a deck design with board colors in hand. You get a written price for the whole project.
Elite files the building permit, and you get a start date once it’s approved. Scheduling around spring demand starts the day you sign.
We build decks on footings below the frost line. Our team bolts and flashes the ledger (the board that attaches the deck to your house), and the frame goes up square and level for inspection.
Installation day: boards go down in the pattern you approved, then the rails and stairs go on and any lighting gets wired.
You walk the finished deck with us, scrap gets hauled away, and you get the care instructions and warranty papers for your boards.
Recent decks from Elite.
Gray capped boards with a picture-frame border in Framingham MA
PVC deck beside an above-ground pool in Framingham MA
Two-level deck stepping down to a patio in Framingham MA
Wraparound deck connecting to a front porch in Framingham MA
Cedar and pressure-treated pine are easier on the budget upfront and have a natural warmth. See Wood Deck Construction.
When the frame is failing, a new surface isn’t enough. See Deck Replacement for tear-out and rebuild.
Compare every material on our Deck Installation page, or see everything Elite builds on the Remodeler page.
Ready for a Deck You’ll Never Stain Again?
Send a photo of your backyard and tell us the color you’re leaning toward.
On This Page
Finished Projects
Gray capped boards with a picture-frame border in Framingham MA
PVC deck beside an above-ground pool in Framingham MA
Two-level deck stepping down to a patio in Framingham MALicensed & Insured
FAQ
Upfront, capped boards cost more than pressure-treated pine and roughly the same as or more than cedar. The board material is only part of the total, though. Framing, footings, stairs and labor are much the same whichever surface you choose.
The gap narrows every year after that. Pressure-treated pine needs washing and a fresh coat of stain every two to three years, and cedar needs sealing to hold its color. Capped boards need a wash with soap and water. Over the life of the deck, the savings on stain, sealer and weekend labor close much of the difference.
Every deck we build with these boards starts with a new frame. Capped and PVC boards usually need joists set closer together than older wood decks were built, and the frame should last as long as the boards on top of it, often 25 years or more. A new frame also brings footings below the frost line, a flashed and bolted ledger, and joist tape, all built to today’s code from day one.
It can. Any dense board warms up in full afternoon sun, and darker colors run hotter than lighter ones. Three choices make the biggest difference:
If your yard faces west or south with no shade, bring it up at the design visit, and we’ll show you samples you can test in your own sun.
Yes. A replacement starts with a full tear-out: the old boards, rails, framing and footings come out and are hauled away before installation begins. A new frame then goes up on new footings, and the capped boards, rails and stairs go on top. Many owners use the replacement to change the shape or size, add a second level, or turn the stairs toward the yard or a patio. See Deck Replacement for how a tear-out and rebuild comes together.
Service Areas
Based in Framingham, Elite offers composite deck building services and decking services to homes in these areas:
Send a photo of your backyard and tell us the color you’re leaning toward. We’ll visit, measure and follow up with a written estimate. Bring your must-haves, like a grill zone or a built-in bench, and we’ll shape the custom deck plan around them.