Mon – Sun · 8:00 AM – 7:00 PM

Deck Installation in Middlesex, MA

Morning coffee in the sun, burgers on the grill, and the kids running out the slider without tracking mud through the kitchen. Composite and wood decks designed for your yard and built to handle New England winters, from a deck builder in Framingham serving all of Middlesex County and surroundings.

Deck Installation

Your Backyard, Finally Part of the House

Right now the back door opens onto three wobbly steps, a patch of grass and a grill parked on pavers. On a nice evening, everyone still eats inside.

Picture the same evening with a deck off the kitchen. Dinner moves outdoors without anyone carrying plates down stairs. Friends gather by the rail while the kids play in the yard below, where you can see them. When the sun goes down, the string lights come on and nobody wants to go in.

A new deck adds the one thing a New England home is short on for half the year: an outdoor room you’ll actually use.

01.

Building in MetroWest Since 2013

02.

40+ Years of Combined Experience

03.

CSL & HIC Licensed

04.

Fully Insured

Why Now

When It’s Time for New Deck Construction

The Old One Has Seen Better Days

You Never Had One

You’re Getting Ready to Sell

Decking materials

Composite, Wood or Vinyl: Pick Decks That Fit How You Live

The decking you choose decides how much weekend time goes to upkeep. We build decks in four main materials.

CompositePressure-treated woodCedarPVC
UpkeepWash once or twice a yearStain or seal every couple of yearsSeal yearly to keep the colorWash only
FeelSmooth, consistentClassic, naturalWarm, aromaticLight, cool underfoot
SplintersNeverPossible as it weathersPossibleNever
Upfront priceHigherLowestMiddleHighest

Composite Decking

Pressure-Treated and Cedar

Vinyl and PVC

Built for New England

Deck Design for Framingham Yards and New England Weather

Footings Below the Frost Line

Every post sits on a concrete footing dug below the frost line (the depth where Massachusetts ground freezes), so frost heave (ground swelling as it freezes) can’t push the deck out of level each spring.

A Ledger That Keeps Water Out

The ledger (the board that bolts the deck to your house) gets flashing behind it, so rain runs off instead of soaking into your rim joist and sill (the framing at the base of your house walls).

Hardware Rated for Treated Lumber

Treated lumber eats ordinary steel. Joist hangers (metal brackets that hold each joist), screws and bolts are coated or stainless, so the deck framing stays strong year after year.

Snow on the Boards

The frame is sized for snow load, and board spacing lets meltwater drain, so a February storm sits on the surface without straining the structure.

Finishing Touches

Porches, Pergolas and Lighting to Finish It

Rails and Stairs

Shade and Shelter

Lighting

Built-Ins

Recent Work

Recent Backyards Our Crew Has Built

Recent projects from Elite.

Composite deck off a kitchen slider in Framingham MA

Two-level cedar deck stepping down to a patio in Framingham MA

Replacement deck with cable railing in Framingham MA

Deck with black rails and lattice skirting in Framingham MA

Reviews

A Client on How Elite Runs a Job

Miriam’s project was inside her home, not out back, but it shows how this crew handles a job from start to finish.

“If I Could Give 10 Stars, I Would!”

How to begin? I am beyond thrilled with the work Elite did in my home. In all, they: ripped out carpet from every single room (and inside every closet), replaced it with gorgeous flooring; removed the tile from around and in front of my fireplace and replaced it; removed and replaced the tile floors from two bathrooms; installed new kitchen countertops; and installed a new backsplash in the kitchen. They sent me to ProSource to pick out all my materials and those people were incredibly helpful. Elite was always responsive, kept me informed about the schedule, and answered my emails promptly. They were thoughtful about making sure I was disrupted as little as possible and made the whole process easy for me. Their work is incredible–they pay attention to the little details and everything looks simply gorgeous. I feel like I’m living in a whole new place and I love it. I loved working with Andrea and Jerry. They asked all the right questions and made suggestions I never would have thought of. From the initial consultation I knew they were true professionals who know what they’re doing. If I could give them 10 stars, I would!

M

Miriam B.

Homeowner

Compare Builders

What to Ask Deck Builders in Framingham Before You Sign

01

Is the hidden work written into the contract?

Footing depth, ledger bolts and flashing should be spelled out, not just the board color.

02

Where does the old deck go?

Elite hauls away old boards and scrap, and the yard is raked clean before the final walkthrough.

03

Who builds it?

Elite’s own carpenters handle the deck installation from footings to the last rail cap.

FAQ

Questions Before the First Footing Goes In

What Does a New Deck Cost?

Six things set the price, in roughly this order:

  1. Size and shape. Square footage, plus extra corners, angles or a second level.
  2. Height off the ground. Taller builds need longer posts, bigger beams and more stairs.
  3. Board material. Pressure-treated pine is the most affordable, cedar sits in the middle, and composite and PVC are at the top.
  4. Railing. Treated pine or composite rails cost less than aluminum or cable.
  5. Stairs and landings. Each run of steps adds framing and footings.
  6. Extras. Built-in benches, lighting, a pergola or a privacy screen.

Your written estimate lists each one separately, so you can see what a material swap or a smaller footprint does to the total and fit the plan to your budget.

Do I Need a Building Permit?

Yes. In Massachusetts, almost every attached or raised build like this needs a building permit, and the state code checks the parts that keep it standing for decades:

  • Footings dug below the frost line, so freeze and thaw can’t lift the posts.
  • The ledger (the board fastened to your house), bolted and flashed so water stays out of your framing.
  • Railings at least 36 inches high, with gaps small enough that a child can’t slip through.
  • Stairs with even steps and a graspable handrail.

The town inspects the footing holes before concrete goes in, then the framing, then the finished build. Elite pulls the permit under its Massachusetts registration and schedules each inspection, which also keeps you covered by the state’s Home Improvement Contractor protections.

How Long Until We Can Use It?

As soon as the final inspection passes. Most builds take one to three weeks of construction once the permit is issued, depending on size and height. Composite and PVC boards are ready for furniture and grilling right away. Pressure-treated boards can be used right away too, but they need a few months to dry before they’re stained, so plan the first coat for the following season.

When Is the Best Time to Build?

For a backyard spot you’re adding for weekends and cookouts, the best plan is to design in winter and build in early spring or fall:

  • Winter: design, selections and the permit, while the schedule is open.
  • Early spring: building begins as soon as the ground thaws, so it’s ready by Memorial Day.
  • Fall: cooler days and an open schedule. Treated lumber dries over the winter and is ready to stain in spring.

If it serves an entrance you use every day, or replaces stairs that aren’t safe, it doesn’t need to wait. Footings can be poured in cold weather with the right precautions, and the work is scheduled as soon as the permit allows.

Can You Replace Just the Boards?

We resurface and rebuild. If the frame and footings pass inspection, a resurfacing replaces all the boards and the rails on the existing frame, giving you a new surface for less than a full rebuild. If the joists, ledger or footings are failing, a full rebuild from new footings up is the safer path.

Ready for Your First Cookout Out Back?

Send a photo of your backyard from the back door and tell us how you’d use the deck. We’ll visit, measure, sketch a design and follow up with a written estimate.

Service Areas

Building Outdoor Spaces Across Middlesex County

Deck services for homes throughout Framingham, MetroWest and Middlesex County, Massachusetts: